Bowes Street Manchester Bus Depot

From design to completion the Beech Group have just completed the demolition of the vast Stagecoach bus station in Manchester. We then devised and carried out a full remediation strategy and returned the 11 acres back to the client ready ...

Read Full Article »

Sevalco Site (North)

It was proposed to demolish a former carbon black plant formerly operated by Columbian Chemicals Ltd. The site infrastructure included a gas production plant, an electrical generating station (power station), the carbon black processing plant with various warehouses and lagoons ...

Read Full Article »

Sandbrook Road, Orrell

Two parcels of land either side of a railway had been purchased for residential redevelopment. The Northern area of land had been previously used for the storage of coal and fuel products. The Southern site had similar uses, plus a ...

Read Full Article »

Great George Square, Liverpool

John Beech Limited carried out he demolition of the warehouse in Liverpool, Involving retention of the front walls.

Read Full Article »

Former Moss Side (Stagecoach) Bus Depot

In the early 1920s a tram depot was established at the 2.5 hectare site. The tram depot operated until the 1950s when it was converted to diesel buses. Part of the site was occupied by a primary school (demolished 2009). ...

Read Full Article »

Woodley Park Centre

Woodley park demolition involved the partial demolition of an existing meditation and function hall, over a one week programme. Beech Group removed external mud bund walls by hand, stripped half the existing wood floor covering and removed concrete slab underneath. ...

Read Full Article »

Stanlow, Ellesmere Port, Cheshire

The last remaining hyperboloid cooling tower at Stanlow has been modified over the years but retains some original aspects of its internal packing support system. Due to freezing conditions and low activity during the cold weather in later 2010 ice accumulating ...

Read Full Article »

Bowes Street Bus Depot

The Beech Group completed the Demolition, Remediation and site clearance of a 24000m2 Bus Depot in Manchester. These works included: Asbestos Removal. Pest control (falcon was used to disturb nesting birds). Scaffolding was erected and associated permits arranged. Removal of Clock Tower by hand ...

Read Full Article »

Bowes Street, Manchester

Beech Group was asked to demolish very carefully and by hand the end three terraced houses of six streets to allow new build timber frame buildings to be erected. We were subsequently awarded the contract to carry out the internal fit ...

Read Full Article »

Bowes Street, Manchester

A Manchester client turned to the Beech Group when the refurbishment of 11 Victorian terraces was not going to plan. Our seasoned operator Dave Hill was parachuted in, and from being around three months behind, the job was completed one week ...

Read Full Article »