Tank 1977 Essar Stanlow

IMGP1394

This contract involved the removal of a floor and floating roof from tank 1977 at Essar Stanlow. We had carefully cut a hole in the side to gain access with the machine and attachments. We were working to a very tight deadline as other works would be getting carried out straight after. We finished within 4 weeks which was well ahead of schedule and we removed over 600 tonnes of steel.