Beech Group News

Woodley Park Centre

Woodley park demolition involved the partial demolition of an existing meditation and function hall, over a one week programme. Beech Group removed external mud bund walls by hand, stripped half the existing wood floor covering and removed concrete slab underneath. ...

Read Full Article »

Stanlow, Ellesmere Port, Cheshire

The last remaining hyperboloid cooling tower at Stanlow has been modified over the years but retains some original aspects of its internal packing support system. Due to freezing conditions and low activity during the cold weather in later 2010 ice accumulating ...

Read Full Article »

Bowes Street Bus Depot

The Beech Group completed the Demolition, Remediation and site clearance of a 24000m2 Bus Depot in Manchester. These works included: Asbestos Removal. Pest control (falcon was used to disturb nesting birds). Scaffolding was erected and associated permits arranged. Removal of Clock Tower by hand ...

Read Full Article »

Bowes Street, Manchester

Beech Group was asked to demolish very carefully and by hand the end three terraced houses of six streets to allow new build timber frame buildings to be erected. We were subsequently awarded the contract to carry out the internal fit ...

Read Full Article »

Bowes Street, Manchester

A Manchester client turned to the Beech Group when the refurbishment of 11 Victorian terraces was not going to plan. Our seasoned operator Dave Hill was parachuted in, and from being around three months behind, the job was completed one week ...

Read Full Article »

Southern Cross school

Beech Group was handed a one month programme to carry out the full demolition of Southern Cross School. This project involved the removal of the slab and the substantial removal of asbestos.

Read Full Article »

St. Wilfreds School

Beech Group conducted a partial demotion and full soft strip of the existing school stores to enable a wraparound extension to be built and form part of the main school. A steel frame was constructed over and around the existing ...

Read Full Article »

Aspinall Primary School

Aspinall Primary School needed demolition (incorporating the asbestos removal) of the old school canteen and community building by Beech Group during term time.  This meant that extra precautions and safety measures had to be put in place due to the ...

Read Full Article »

Shell UK Ltd

Following structural surveys to several of Shell UK’s large crude storage tanks at Stanlow, a decision was reached to renew some tank floors. Beech Group were contracted to cut out and remove the tank floors and associated pipework. The floors were ...

Read Full Article »

Elizabeth Shaw Works, Bristol

It was proposed to redevelop the former Elizabeth Shaw Chocolate factory in Bristol. All original multi-storey buildings were to be retained on the site and converted to residential flats. The site complex contained above ground storage tanks (fuel – ASTs) ...

Read Full Article »