Beech Group News

Chester City Council

After a fire Chester City council called Beech out for emergency works. The building had been gutted by fire making it unsafe for anyone to enter. Due to the proximity of the building to Chester train station the station was ...

Read Full Article »

Shell haven Bitumen Plant

Shell UK needed the bitumen refinery at Shell Haven to be completely moved back to a bare site. Beech had previously carried two projects of the same magnitude and type. This contract went so well that the then Head of ...

Read Full Article »

Tank 1997

This unusual contract involved the removal of a floor from a 30 meter diameter tank. Beech had to carefully remove the existing floor which had been coated with an epoxy resin. The old floor was then cut up within the ...

Read Full Article »

Shell Aromatic Columns

Beech were asked to take out these foot columns from within the confines of a live refinery complex. The columns were within a live working refinery with pipework and pump aisles surrounding them on all sides. The client needed someone ...

Read Full Article »

Unit 30

This contract for Shell UK involved the removal of a complete plant from within an area where live plant had to remain on line. Beech were first required to remove the asbestos problems using their team of licenced operatives. The ...

Read Full Article »
Accreditations Beech Group Accreditations