Monthly Archives: May 2018

Holyhead Terminal

Beech Group recently collaborated with Royal Haskoning DHV in the redesign and replacement of the Port of Holyhead passenger walkway. Haskoning designed the new structures and Beech dismantled and removed the redundant ones . The project went seamlessly and involved ...

Read Full Article »

Alder Hey Children’s Hospital

Demolition works are in full swing at the the old Alder Hey Children’s Hospital in Liverpool. This is a phased demolition project and we have just completed area 1 of 3 on phase 1, which incorporates the main Hospital buildings and Mulberry ...

Read Full Article »

Tranmere North Gangway Replacement

On Wednesday 27th June, the key safety barrier on the Tranmere waterfront (which is used for getting all Essar, Port and Ship visitors on and off the ships safely) was removed ready for a replacement arriving before year end. Once all ...

Read Full Article »

Alder Park

This project was the asbestos removal and demolition of The Park Unit, a freehold property owned by Liverpool Children's Hospital Alder Hey NHS Foundation Trust. It was sited in Alder Park, Waterloo and was a three storey building which was vacant but was previously used ...

Read Full Article »

Klondyke Phase 2 & 3, Bootle

This was the second and third phase of the Klondyke project in Bootle, that  involved the demolition and site clearance of 465 terraced housed, one apartment block and 37 garages. These works included: Asbestos Removal. Soft strip. Demolition and site clearance (some were separated and ...

Read Full Article »

FCCU Regen Head, Essar, Stanlow

The Cracker Head (CCU) demolition has got to be one of 2015's most exciting and challenging projects. Our highly skilled team lifted the 500 tonne structure down to the ground using a 1200 tonne specialist crane, powder cut and separated it ...

Read Full Article »

Springwell Church , Bootle

Beech successfully completed the demolition of Springwell church in Bootle for our regular client Sefton Council. Sadly the chapel had been neglected and was not economically viable to refurbish. As a result of further vandalism and arson, the council came ...

Read Full Article »

Former Calor Gas Site, Ellesmere Port

Beech Demolition have recently completed the demolition of the former Calor Gas Site in Ellesmere Port, Wirral. The scope included the soft stripping of several buildings and sheds preceding the demolition of such structures. There was a significant asbestos scope ...

Read Full Article »

Bitumen Plant, Shell Haven, Essex

Shell UK needed the bitumen refinery at Shell Haven to be completely moved back to a bare site. Beech had previously carried two projects of the same magnitude and type. This contract went so well that the then Head of ...

Read Full Article »

Beech Remediation

The Remediation and Consultancy arm are currently assisting TEPCO (Tokyo Electric Light Company) which operates the Fukushima Daiichi nuclear power plant in Japan. A briefing/workshop was held with representatives of TEPCO and the UK Trades & Industry, where there was ...

Read Full Article »
Accreditations Beech Group Accreditations