Project Details
  • Client Essar
  • Duration 3 months
  • Budget Undisclosed
Looking for something similar? Call us on 0151 645 7571
to discuss your project

Asbestos Linework, Stanlow Oil Refinery

Beech Group successfully tendered for the safe removal of Asbestos insulated pipework at the Stanlow Manufacturing Complex fully implementing the Control of Asbestos Regulations 2012 and the principles from HSG247. The majority of the work coincided with high maintenance activites associated with the refinery Major Turnaround, with various activities planned adjacent to the pipetracks and planned works. Therefore, close liaison and co-operation needed to be maintained throughout whilst still meeting targets. The pipe-work was situated mostly at ground level within open air remote live pipetracks forming part of the distribution system for the petro-chemical complex. The pipework was removed using cut and wrap techniques at approximately 5.0 metre intervals (all approved by the HSE).

  • Licensed Asbestos Removal Contractor (Renewed February 2013 for 3 years)
  • Fully implement the Control of Asbestos Regulations 2012
  • Complex nature of work due to the location of the pipework
  • Robust Permit to Work System
  • Behavioural Safety Risk Assessment Procedure (‘The Four Whats’)
  • Detailed Method Statement & Risk Assessments for each task
  • Safely managing and executing activities in hazardous environments
  • Seamlessly adopt and follow client HSSE policies and procedures

 

 