Project Details
  • Client GB Buildings
  • Duration 1 year
  • Budget Undisclosed
Looking for something similar? Call us on 0151 645 7571
to discuss your project

Bowes Street Bus Depot, Moss Side

From design to completion the Beech Group completed the demolition of the vast Stagecoach bus station in Manchester. We then devised and carried out a full remediation strategy and returned the 11 acres back to the client ready to build on. All discussion with the EA were managed by Beech Group. The remediation strategy for the hydrocarbon pollution was designed and implemented by the Beech Group which involved the treatment of 2000 tonnes with microbial bugs.