Project Details
  • Client Essar
  • Duration 6 Months
  • Budget Undisclosed
Looking for something similar? Call us on 0151 645 7571
to discuss your project

FCCU Regen Head, Essar, Stanlow

The Cracker Head (CCU) demolition has got to be one of 2015’s most exciting and challenging projects. Our highly skilled team lifted the 500 tonne structure down to the ground using a 1200 tonne specialist crane, powder cut and separated it into sections and processed the stainless steel.

 

  • Large Scale Operational Manufacturing Complex
  • Awareness of adjacent live working units
  • Robust Permit to Work System
  • Detailed Method Statement & Risk Assessments
  • Safely managing and executing activities in hazardous environments
  • Seamlessly adopt and follow client HSSE policies and procedures

Along with the excellent result came praise from our client in Stanlow. The senior manager there wrote:

‘a non routine activity, all works including the lift from its support frame to the clearing of the area post demolition have been completed without incident and in my opinion a very professional manner’

 

Accreditations Beech Group Accreditations